HERE COME, SOON, WILL 'REDUCED THE PARK "Pertini

" In the publication No. 3 raised the possibility of creating a large room in the center that could hold any public display created by the Pro Loco, from 'Municipal Administration or by an association of public view, using the property in the center put up for sale by f.lli Drei located in Via Aldo Moro No. 4, instead of using Park Pertini ...
... we wanted to better analyze this hypothesis, ..., evaluate it carefully and present it to the public for how it could be seriously considered by those responsible, instead of the planned project and approved February 23 last in the 2009 budget by the City Council. Meanwhile
premise that it would be a thing well done bring to the attention of a national project of this magnitude ... but assumed the failure of the procedure and the determination of the Board was so ingrained, so it was thought that, so it was decided and so we had to proceed in the direction taken. In the resolution of the Board
No. 134, December 9 last year, we got the hard copy by the mayor, that is exactly specified the construction of the building will be provided in the Park Pertini place intended to "create a service center for advanced placement of spaces for use by Pro Loco, which will be implemented in order to move the existing parking spaces reserved in this May 1 in the most central for tourist use of the Park and the historic center of Riolo Terme. "
This measure is also supported as" cultural heritage and environment as it fits harmoniously in the area characterized by: 1 - presence of the urban park; 2 - presence of the convention center, 3 - Corso Matteotti, which overlooks the main street of the Old Town Square and leading to the fortress, 4 - pine trees that connects the area receiving the intervention, with the main road connecting the valley floor. "
And, for an explanation of greater efficiency is specified that" this project is part of and contributes to the achievement of a broader project concerning the Regional Park Chalk Vein AND ITS PATH, with the creation of centers, exhibition areas and educational facilities. " So you tell us how many
prevarication and turns of concepts and words for not having the courage and use the objectivity to say (certainly well known for bureaucratic reasons) that in practice you want to build a building with concrete structure and brick to view, to block use of the kitchens and Pro Loco "(as clearly stated and well in the Descriptive Report of the architect Valerio Savini, which states that" the building is organized on two floors in a basement for storage and use and a pantry on the ground floor in the kitchen.)
But it was done before then to say: "for the edification of cuisines to create an outdoor restaurant?" ... "the specification or would have affected the allocation of European Regional Development Fund, as perhaps it is more likely ?
Ending the description of the architect, "this building will be covered with a glued-laminated timber structure in which protruding cantilever cover also that the space in front of the building will be located where the tables for the food stand. "
This operation will use the park for about 500 square meters on the current total area of \u200b\u200b880 square meters ....
... ... we have asked our technical confidence, only to show that we have not spoken in vain. Therefore, we present an easy comparison with a project he created, so an alternative hypothesis, knowing that it will remain without further development.


municipal projects:
1 - Working for more than half of the green area of \u200b\u200bthe Park "Pertini"
2 - reinforced concrete structure on 2 levels:
a. Basement: for warehouse use and dispenses with the use of elevators;
b. Ground floor: in the kitchen;
3 - Total area reserved spaces available for catering:
- Open-roofed:
150 sqm - fully discovered: 150 sqm Total
catering
300 sqm - Total area 200 sqm building
Total General (excluding basement) 500 sqm
4 - Building to be built entirely
5 - Surface remains fully dedicated to children for free games and equipment: 380mq from the current 880 square meters
6 - Making use of external ramps for disabled
7 - Place served by road difficult for loading and unloading goods
8 - Unable to use the premises for catering in case of bad weather and during cold seasons
9 - for future expansion of the multi-purpose: the risk of complete elimination of the Park
10 - Seats:
- roofed: 120
- Uncovered: 120
Total posts: 240
11 - Approved by City Council February 23, 2009 U.S. spending on a preliminary run of 880,000 will
€ 12 - the same place where the building will be built kitchens today there is a plaque recalls that, right there, they were buried the bodies found in Riolo during the war.
In 1995 it enacted the sacredness. And today?


ALTERNATIVE PROJECT (proposed by "Il Picchio"): 1
Park - "Pertini" not involved: local use elsewhere
2 - Construction on 2 levels:
- Basement: in the kitchen, warehouse and pantry, with use hoists
- Ground floor: to use hall, meeting room ambivalent, small pantry and storage room for equipment, office and office-by-step food distribution area
3 - Total area reserved spaces available for catering:
- Hall (inside ): living room: Meeting room 370 sq
ambivalent
60 sqm - Discovered (outside): 125 sq.m. Total
catering
555 sqm - Guest list (inside) 252 sqm
Grand total (excluding basement) 807 sqm
4 - existing building is fully renovated
5 - A surface that would be entirely up to the kids themselves: all the 880 sq m currently available to the Park
6 - Not necessary ramps for disabled people because the room is at street level
7 - Location well served by existing roads
8 - Full accommodation is available in all seasons (available heating and air conditioning)
9 - Do not need any expansion to the existing local is certainly able to accommodate large numbers of admissions
10 - Number of Seating:
- Inside: 350
- Outside: 100 Total number 450

11 - The restoration would entail a total expenditure of € 750 per sq m, so, having to settle only the inner wall surface of 600 square meters, the total cost would reach the € 450,000, after the purchase that could be defined with 350,000 €.
Operation "Drei" would have been able to define as a total amount of 800,000 €. FINAL REMARKS

the difference between the 2 projects is very clear: not so much the economic aspect ... as for the possibility of greater use of space in the second case: over 800 sqm to 500 sqm against Pertini in the Park ... in our project appears useful in several rooms that harmonize peu much better to use that space for possible trade fairs, exhibitions, conferences, folk dances and meetings and meetings of all kinds and to come all year, leaving intact most of the only green park available ...